Richard E Jewell v. Casa Fiesta Townhouses Corp.

Case Summary

Case ID 22F-H2221005-REL
Agency ADRE
Tribunal OAH
Decision Date 2021-10-25
Administrative Law Judge Tammy L. Eigenheer
Outcome loss
Filing Fees Refunded $0.00
Civil Penalties $0.00

Parties & Counsel

Petitioner Richard E Jewell Counsel
Respondent Casa Fiesta Townhouses Corp. Counsel Nicole Payne and Carlotta L. Turman

Alleged Violations

A.R.S. § 33-1811

Outcome Summary

The Petitioner's petition alleging the HOA violated conflict of interest statutes (A.R.S. § 33-1811) was dismissed because the Petitioner failed to sustain the burden of proof, as the conflict was deemed sufficiently disclosed prior to the board action.

Why this result: Petitioner failed to sustain the burden of proof on the alleged violation.

Key Issues & Findings

Board Member Conflict of Interest Disclosure

Petitioner alleged the HOA violated the statute regarding conflict of interest when the board hired the board president as a paid office assistant and the conflict was not disclosed by the president. The ALJ found that while the president did not disclose the conflict, the conflict was made known by another attendee prior to discussion and action, fulfilling the statutory purpose.

Orders: Petitioner’s petition be dismissed.

Filing fee: $0.00, Fee refunded: No

Disposition: respondent_win

Cited:

  • A.R.S. § 33-1811
  • A.R.S. § 33-1243(c)
  • A.R.S. Title 32, Ch. 20, Art. 11
  • Arizona Administrative Code R2-19-119
  • A.R.S. § 1-211(B)
  • Gutierrez v. Industrial Commission of Arizona, 226 Ariz. 395, 249 P.3d 1095 (2011)
  • State v. McFall, 103 Ariz. 234, 238, 439 P.2d 805, 809 (1968)
  • BLACK’S LAW DICTIONARY 1373 (10th ed. 2014)

Analytics Highlights

Topics: HOA governance, Conflict of interest, Statutory interpretation, Board voting
Additional Citations:

  • A.R.S. § 33-1811
  • A.R.S. § 33-1243(c)
  • A.R.S. Title 32, Ch. 20, Art. 11
  • Arizona Administrative Code R2-19-119
  • A.R.S. § 1-211(B)
  • Gutierrez v. Industrial Commission of Arizona, 226 Ariz. 395, 249 P.3d 1095 (2011)
  • State v. McFall, 103 Ariz. 234, 238, 439 P.2d 805, 809 (1968)
  • BLACK’S LAW DICTIONARY 1373 (10th ed. 2014)

Audio Overview

Decision Documents

22F-H2221005-REL Decision – 920344.pdf

Uploaded 2025-10-09T03:37:56 (89.3 KB)

Gregory L Smith v. Mountain Bridge Community Association

Case Summary

Case ID 21F-H2121037-REL
Agency ADRE
Tribunal OAH
Decision Date 2021-06-11
Administrative Law Judge Adam D. Stone
Outcome partial
Filing Fees Refunded $1,500.00
Civil Penalties $0.00

Parties & Counsel

Petitioner Gregory L. Smith Counsel
Respondent Mountain Bridge Community Association Counsel Nicole Payne, Esq.

Alleged Violations

A.R.S. § 33-1811
CC&R Article 11.3.2

Outcome Summary

The Petitioner prevailed on the claim of violating CC&R Article 11.3.2 (failure to negotiate in good faith) but was denied relief on the claim of violating A.R.S. § 33-1811 (conflict of interest). Petitioner was ordered reimbursed $500.00 for the filing fee.

Why this result: Petitioner failed to prove the A.R.S. § 33-1811 violation because the statute was interpreted by the Tribunal to require the action to involve compensation.

Key Issues & Findings

Conflict of Interest Disclosure

Petitioner alleged the Respondent violated A.R.S. § 33-1811 because the HOA President failed to disclose a conflict of interest during the approval of his own flagpole. The Tribunal found the statute requires the decision to involve compensation, and Petitioner failed to meet the burden of proof.

Orders: Petition denied as to a violation of A.R.S. 33-1811. Tribunal declined to award a civil penalty.

Filing fee: $1,000.00, Fee refunded: No

Disposition: petitioner_loss

Cited:

  • A.R.S. § 33-1811

Failure to Negotiate Claim Resolution in Good Faith

Petitioner claimed Mountain Bridge failed to negotiate a resolution in good faith after he filed a claim notice. Mountain Bridge failed to communicate until approximately 35 days after the claim was noticed. The Tribunal found Respondent failed to negotiate in good faith.

Orders: Petitioner is deemed the prevailing party as to his claim of an Article 11 violation. Respondent must reimburse the $500.00 filing fee within 30 days. Tribunal declined to award a civil penalty.

Filing fee: $500.00, Fee refunded: Yes

Disposition: petitioner_win

Cited:

  • CC&R Article 11.3.2

Analytics Highlights

Topics: HOA, Conflict of Interest, Failure to Negotiate, Flagpole, Filing Fee
Additional Citations:

  • A.R.S. § 33-1811
  • A.R.S. § 32-2199(B)
  • A.R.S. § 41-1092.07(G)(2)
  • A.A.C. R2-19-119(A)
  • A.A.C. R2-19-119(B)(1)
  • A.A.C. R2-19-119(B)(2)
  • A.R.S. § 32-2199.02(B)
  • A.R.S. § 32-2199.04
  • A.R.S. § 41-1092.09

Audio Overview

Decision Documents

21F-H2121037-REL Decision – 887461.pdf

Uploaded 2025-10-09T03:36:47 (121.4 KB)

Rick & Lisa Holly v. La Barranca II Homeowners Association

Case Summary

Case ID 20F-H2019020-REL
Agency ADRE
Tribunal OAH
Decision Date 2020-02-14
Administrative Law Judge Diane Mihalsky
Outcome loss
Filing Fees Refunded $0.00
Civil Penalties $0.00

Parties & Counsel

Petitioner Rick and Lisa Holly Counsel Kevin P. Nelson, Esq.
Respondent La Barranca II Homeowners Association Counsel Edward D. O’Brien, Esq.

Alleged Violations

A.R.S. § 33-1817(B); CC&R Article 11.2.5
A.R.S. § 33-1811; CC&R Article 4.7
A.R.S. § 33-1803; CC&Rs Articles 11.3 and 12

Outcome Summary

The Administrative Law Judge dismissed the petition, finding that the Petitioners failed to establish by a preponderance of the evidence that the Respondent Homeowners Association violated A.R.S. §§ 33-1803, 33-1811, or 33-1817, or any of the cited CC&R provisions concerning intentional construction delay, conflict of interest, or retaliatory fines.

Why this result: Petitioners failed to meet the burden of proof (preponderance of the evidence) on all three issues alleged in the petition.

Key Issues & Findings

Intentional delay of construction

Petitioners alleged that Respondent intentionally delayed the approval and construction of their new home for over eleven months.

Orders: Petition dismissed.

Filing fee: $0.00, Fee refunded: No

Disposition: petitioner_loss

Cited:

  • A.R.S. § 33-1817(B)
  • CC&R Article 11.2.5

Conflict of interest

Petitioners alleged that a Board Vice President and Secretary (who owned lots adjacent to Petitioners') were blocking approval of the home due to a conflict of interest.

Orders: Petition dismissed.

Filing fee: $0.00, Fee refunded: No

Disposition: petitioner_loss

Cited:

  • A.R.S. § 33-1811
  • CC&R Article 4.7

Retaliatory fines

Petitioners alleged fear of prospective retaliatory imposition of fines.

Orders: Petition dismissed.

Filing fee: $0.00, Fee refunded: No

Disposition: petitioner_loss

Cited:

  • A.R.S. § 33-1803(B)
  • CC&R Article 11.3
  • CC&R Article 12

Analytics Highlights

Topics: HOA, Planned Communities Act, Architectural Review Committee (ARC), Construction Delay, Conflict of Interest, Retaliatory Fines
Additional Citations:

  • A.R.S. § 33-1803
  • A.R.S. § 33-1803(B)
  • A.R.S. § 33-1811
  • A.R.S. § 33-1817
  • A.R.S. § 33-1817(B)
  • A.R.S. § 32-2199(B)
  • A.R.S. § 41-1092.07(G)(2)
  • A.A.C. R2-19-119(A)
  • A.A.C. R2-19-119(B)(1)
  • A.A.C. R2-19-119(B)(2)
  • CC&R Article 4.7
  • CC&R Article 11.2.5
  • CC&R Article 11.3
  • CC&R Article 12

Audio Overview

Decision Documents

20F-H2019020-REL Decision – 769746.pdf

Uploaded 2025-10-08T07:10:25 (191.2 KB)

Rick & Lisa Holly v. La Barranca II Homeowners Association

Case Summary

Case ID 20F-H2019020-REL
Agency ADRE
Tribunal OAH
Decision Date 2020-02-14
Administrative Law Judge Diane Mihalsky
Outcome loss
Filing Fees Refunded $0.00
Civil Penalties $0.00

Parties & Counsel

Petitioner Rick and Lisa Holly Counsel Kevin P. Nelson, Esq.
Respondent La Barranca II Homeowners Association Counsel Edward D. O’Brien, Esq.

Alleged Violations

A.R.S. § 33-1817(B); CC&R Article 11.2.5
A.R.S. § 33-1811; CC&R Article 4.7
A.R.S. § 33-1803; CC&Rs Articles 11.3 and 12

Outcome Summary

The Administrative Law Judge dismissed the petition, finding that the Petitioners failed to establish by a preponderance of the evidence that the Respondent Homeowners Association violated A.R.S. §§ 33-1803, 33-1811, or 33-1817, or any of the cited CC&R provisions concerning intentional construction delay, conflict of interest, or retaliatory fines.

Why this result: Petitioners failed to meet the burden of proof (preponderance of the evidence) on all three issues alleged in the petition.

Key Issues & Findings

Intentional delay of construction

Petitioners alleged that Respondent intentionally delayed the approval and construction of their new home for over eleven months.

Orders: Petition dismissed.

Filing fee: $0.00, Fee refunded: No

Disposition: petitioner_loss

Cited:

  • A.R.S. § 33-1817(B)
  • CC&R Article 11.2.5

Conflict of interest

Petitioners alleged that a Board Vice President and Secretary (who owned lots adjacent to Petitioners') were blocking approval of the home due to a conflict of interest.

Orders: Petition dismissed.

Filing fee: $0.00, Fee refunded: No

Disposition: petitioner_loss

Cited:

  • A.R.S. § 33-1811
  • CC&R Article 4.7

Retaliatory fines

Petitioners alleged fear of prospective retaliatory imposition of fines.

Orders: Petition dismissed.

Filing fee: $0.00, Fee refunded: No

Disposition: petitioner_loss

Cited:

  • A.R.S. § 33-1803(B)
  • CC&R Article 11.3
  • CC&R Article 12

Analytics Highlights

Topics: HOA, Planned Communities Act, Architectural Review Committee (ARC), Construction Delay, Conflict of Interest, Retaliatory Fines
Additional Citations:

  • A.R.S. § 33-1803
  • A.R.S. § 33-1803(B)
  • A.R.S. § 33-1811
  • A.R.S. § 33-1817
  • A.R.S. § 33-1817(B)
  • A.R.S. § 32-2199(B)
  • A.R.S. § 41-1092.07(G)(2)
  • A.A.C. R2-19-119(A)
  • A.A.C. R2-19-119(B)(1)
  • A.A.C. R2-19-119(B)(2)
  • CC&R Article 4.7
  • CC&R Article 11.2.5
  • CC&R Article 11.3
  • CC&R Article 12

Audio Overview

Decision Documents

20F-H2019020-REL Decision – 769746.pdf

Uploaded 2025-10-09T03:34:41 (191.2 KB)

Mark Virden vs. Lakeside Ski Village HOA

Case Summary

Case ID 17F-H1717027-REL
Agency ADRE
Tribunal OAH
Decision Date 2017-06-27
Administrative Law Judge Tammy L. Eigenheer
Outcome loss
Filing Fees Refunded $500.00
Civil Penalties $0.00

Parties & Counsel

Petitioner Mark Virden Counsel
Respondent Lakeside Ski Village HOA Counsel Stewart F. Salwin

Alleged Violations

A.R.S. § 33-1811

Outcome Summary

The petition was denied because the Tribunal found that the HOA's Architectural Committee had the authority to approve the internet tower under the governing documents (CC&Rs) without requiring ratification or disclosure of potential conflicts to the members acting as the board, thus avoiding a violation of A.R.S. § 33-1811 in this instance.

Why this result: The decision to approve the tower was made by the Architectural Committee, which had independent authority under the CC&Rs. Therefore, the requirements of A.R.S. § 33-1811 regarding disclosure of compensation to the members acting as the board were found not to apply to the Committee's action.

Key Issues & Findings

Board of Directors, Contracts, and Conflicts

Petitioner alleged that the HOA violated A.R.S. § 33-1811 when it allowed the construction of an internet service tower after a board member's spouse paid the upfront fee in exchange for permanent free service (compensation). Petitioner argued this compensation required disclosure in an open meeting of the board before approval, which did not occur.

Orders: Petitioner's petition is denied.

Filing fee: $500.00, Fee refunded: No

Disposition: respondent_win

Cited:

  • A.R.S. § 33-1811
  • A.R.S. § 32-2199 et seq.
  • A.A.C. R2-19-119
  • A.R.S. § 33-1804

Analytics Highlights

Topics: conflict_of_interest, architectural_committee, board_authority, internet_tower, compensation, CC&Rs
Additional Citations:

  • A.R.S. § 33-1811
  • A.R.S. § 32-2199 et seq.
  • A.A.C. R2-19-119
  • A.R.S. § 33-1804

Video Overview

Audio Overview

Decision Documents

17F-H1717027-REL Decision – 571928.pdf

Uploaded 2025-10-09T03:31:29 (82.2 KB)

17F-H1717027-REL Decision – 575046.pdf

Uploaded 2025-10-09T03:31:29 (736.4 KB)





Briefing Doc – 17F-H1717027-REL


Briefing: Virden v. Lakeside Ski Village HOA (Case No. 17F-H1717027-REL)

Executive Summary

This briefing document outlines the legal dispute between homeowner Mark Virden (Petitioner) and the Lakeside Ski Village Homeowners Association (Respondent) concerning the construction of an internet service tower on HOA common property. The Petitioner alleged a violation of Arizona’s conflict of interest statute (A.R.S. § 33-1811), asserting that HOA officials received undisclosed compensation—lifelong free internet service—in exchange for approving the tower.

The case culminated in a definitive ruling against the Petitioner. An Administrative Law Judge (ALJ) denied the petition, a decision that was subsequently adopted and finalized by the Commissioner of the Arizona Department of Real Estate. The core of the ruling rested on the HOA’s unique governance structure. The decision to approve the tower was made not by the general “board of directors” (in this HOA, the members act as the board), but by the Architectural Committee, which was vested with independent authority to do so by the HOA’s governing documents (CC&Rs). Consequently, the ALJ concluded that the state law requiring conflict of interest disclosures before the board was not applicable to the committee’s action, rendering the Petitioner’s central argument invalid. The approval of the tower was deemed proper under the HOA’s governing rules.

Case Overview

Entity

Name / Description

Case Number

17F-H1717027-REL

Petitioner

Mark Virden

Respondent

Lakeside Ski Village HOA

Presiding ALJ

Tammy L. Eigenheer

Adjudicating Body

Arizona Office of Administrative Hearings

Final Authority

Commissioner, Arizona Department of Real Estate

Timeline of Key Events

Circa 2017: The internet company AireBeam approached the HOA to install a service tower but did not secure enough subscribers to fund the project.

Circa 2017: Lou Talarico, husband of an Architectural Committee member, offered to pay the tower’s upfront cost in exchange for free service for himself and HOA Vice President Carl Rygg. The Architectural Committee subsequently approved construction.

March 23, 2017: Mark Virden filed a petition with the Arizona Department of Real Estate, alleging a conflict of interest violation.

June 7, 2017: A hearing was held at the Office of Administrative Hearings.

June 27, 2017: ALJ Tammy L. Eigenheer issued a decision denying the Petitioner’s petition.

July 10, 2017: The Commissioner of the Department of Real Estate issued a Final Order adopting the ALJ’s decision.

Petitioner’s Allegations and Arguments

The petition filed by Mark Virden centered on a violation of A.R.S. § 33-1811, which governs contracts and conflicts of interest for HOA boards of directors.

Primary Allegation: Undisclosed Conflict of Interest

The Petitioner alleged that the HOA violated state law by failing to disclose a conflict of interest related to the tower’s approval.

The Conflict: Susan Talarico, a licensed realtor serving on the Architectural Committee, had a conflict because her husband, Lou Talarico, paid an upfront fee to the tower company. In exchange for this payment, the Talaricos and HOA Vice President Carl Rygg were to receive free internet service for as long as the tower remained operational.

The Alleged Violation: According to the petition, this arrangement constituted compensation that should have been formally declared in an open meeting before any action was taken, as required by law. The petition states: “This law states that if a member of the board is receiving compensation, and has not declared that conflict in advance, then any contract entered into in violation of this law is void and unenforceable!”

Perceived Inadequate Compensation: The Petitioner claimed the value of the free service far exceeded the cash contribution, stating, “…their contribution would only pay the equivalent of about 1-2 years of service for the two households.”

Lack of Transparency: The petition alleges a refusal by the involved board members to provide details of their arrangement. When asked about the compensation, the Vice President reportedly stated, “it’s none of your business.”

Secondary Argument

The Petitioner alternatively argued that the Architectural Committee exceeded its authority. Because the tower could provide service to individuals outside the HOA, it was not exclusively “for the benefit of all or portions” of the HOA, as stipulated by the governing documents.

Personal Grievance

The petition notes a direct personal impact on the Petitioner, stating that the tower was constructed within 150 feet of his front door and that he found it to be “a huge eye sore.”

Respondent’s Governance and Authority

The Lakeside Ski Village HOA’s defense rested on its specific governing documents and organizational structure, which were found to be central to the case’s outcome.

Unconventional Board Structure: The HOA does not have a traditional, separate board of directors. Its Bylaws stipulate that “The affairs of the Association will be managed by the Members, who by the Association’s Articles of Organization are authorized to exercise all powers normally exercised by a board of directors.”

Delegated Authority to Architectural Committee: The HOA’s Declaration of Covenants, Conditions, Restrictions and Easements (CC&Rs) grants specific and independent power to its Architectural Committee. The CC&Rs state: “The Architectural Committee may permit one or more aerial satellite dishes or satellite communication systems, and/or other apparatus and equipment for an antenna or cable system for the benefit of all or portions of the Project.”

This structure meant that the authority to approve the tower resided with the committee, not the general membership acting as a board.

Adjudication and Final Ruling

The dispute was adjudicated by the Office of Administrative Hearings, with the final decision adopted by the Department of Real Estate. The Petitioner’s claims were ultimately rejected.

Administrative Law Judge’s Decision

The ALJ’s decision, issued on June 27, 2017, denied the petition based on the following legal rationale:

Architectural Committee’s Authority Was Dispositive: The ALJ found that the CC&Rs explicitly empowered the Architectural Committee to approve the communication tower. Crucially, the decision established that “Nothing in the CC&Rs requires that the Architectural Committee’s decision must be ratified by the members acting as a board.”

Conflict of Interest Law Not Applicable: A.R.S. § 33-1811 applies to actions and decisions taken “by or on behalf of the board of directors.” Because the Architectural Committee acted under its own authority granted by the CC&Rs, its decision was not an action of the “board” as defined by the statute.

Conclusion on Disclosure: The ALJ concluded that even if the free internet service was considered compensation (assuming arguendo), the arrangement “did not have to be disclosed to the members acting as a board.”

Rejection of Secondary Argument: The ALJ dismissed the argument that the tower did not benefit the HOA, noting that the CC&R language “does not require that the satellite dish or other system may benefit exclusively all or portions of the HOA.”

The final conclusion of the tribunal was that “the Architectural Committee’s approval of the AireBeam tower was proper under Respondent’s governing documents.”

Final Order of the Department of Real Estate

On July 10, 2017, Judy Lowe, Commissioner of the Department of Real Estate, issued a Final Order that formally adopted the ALJ’s decision.

Outcome: The Petitioner’s petition was officially denied.

Binding Nature: The Order is binding on the parties and represents a final administrative action.

Avenues for Appeal: The Order noted that a party may request a rehearing within 30 days for specific causes, such as procedural irregularity, newly discovered evidence, or an arbitrary or capricious decision. Furthermore, a party may appeal the final administrative decision by filing a complaint for judicial review.


Mark Virden vs. Lakeside Ski Village HOA

Case Summary

Case ID 17F-H1717027-REL
Agency ADRE
Tribunal OAH
Decision Date 2017-06-27
Administrative Law Judge Tammy L. Eigenheer
Outcome loss
Filing Fees Refunded $500.00
Civil Penalties $0.00

Parties & Counsel

Petitioner Mark Virden Counsel
Respondent Lakeside Ski Village HOA Counsel Stewart F. Salwin

Alleged Violations

A.R.S. § 33-1811

Outcome Summary

The petition was denied because the Tribunal found that the HOA's Architectural Committee had the authority to approve the internet tower under the governing documents (CC&Rs) without requiring ratification or disclosure of potential conflicts to the members acting as the board, thus avoiding a violation of A.R.S. § 33-1811 in this instance.

Why this result: The decision to approve the tower was made by the Architectural Committee, which had independent authority under the CC&Rs. Therefore, the requirements of A.R.S. § 33-1811 regarding disclosure of compensation to the members acting as the board were found not to apply to the Committee's action.

Key Issues & Findings

Board of Directors, Contracts, and Conflicts

Petitioner alleged that the HOA violated A.R.S. § 33-1811 when it allowed the construction of an internet service tower after a board member's spouse paid the upfront fee in exchange for permanent free service (compensation). Petitioner argued this compensation required disclosure in an open meeting of the board before approval, which did not occur.

Orders: Petitioner's petition is denied.

Filing fee: $500.00, Fee refunded: No

Disposition: respondent_win

Cited:

  • A.R.S. § 33-1811
  • A.R.S. § 32-2199 et seq.
  • A.A.C. R2-19-119
  • A.R.S. § 33-1804

Analytics Highlights

Topics: conflict_of_interest, architectural_committee, board_authority, internet_tower, compensation, CC&Rs
Additional Citations:

  • A.R.S. § 33-1811
  • A.R.S. § 32-2199 et seq.
  • A.A.C. R2-19-119
  • A.R.S. § 33-1804

Audio Overview

Decision Documents

17F-H1717027-REL Decision – 571928.pdf

Uploaded 2025-10-08T06:50:49 (82.2 KB)

17F-H1717027-REL Decision – 575046.pdf

Uploaded 2025-10-08T06:50:50 (736.4 KB)





Briefing Doc – 17F-H1717027-REL


Briefing: Virden v. Lakeside Ski Village HOA (Case No. 17F-H1717027-REL)

Executive Summary

This briefing document outlines the legal dispute between homeowner Mark Virden (Petitioner) and the Lakeside Ski Village Homeowners Association (Respondent) concerning the construction of an internet service tower on HOA common property. The Petitioner alleged a violation of Arizona’s conflict of interest statute (A.R.S. § 33-1811), asserting that HOA officials received undisclosed compensation—lifelong free internet service—in exchange for approving the tower.

The case culminated in a definitive ruling against the Petitioner. An Administrative Law Judge (ALJ) denied the petition, a decision that was subsequently adopted and finalized by the Commissioner of the Arizona Department of Real Estate. The core of the ruling rested on the HOA’s unique governance structure. The decision to approve the tower was made not by the general “board of directors” (in this HOA, the members act as the board), but by the Architectural Committee, which was vested with independent authority to do so by the HOA’s governing documents (CC&Rs). Consequently, the ALJ concluded that the state law requiring conflict of interest disclosures before the board was not applicable to the committee’s action, rendering the Petitioner’s central argument invalid. The approval of the tower was deemed proper under the HOA’s governing rules.

Case Overview

Entity

Name / Description

Case Number

17F-H1717027-REL

Petitioner

Mark Virden

Respondent

Lakeside Ski Village HOA

Presiding ALJ

Tammy L. Eigenheer

Adjudicating Body

Arizona Office of Administrative Hearings

Final Authority

Commissioner, Arizona Department of Real Estate

Timeline of Key Events

Circa 2017: The internet company AireBeam approached the HOA to install a service tower but did not secure enough subscribers to fund the project.

Circa 2017: Lou Talarico, husband of an Architectural Committee member, offered to pay the tower’s upfront cost in exchange for free service for himself and HOA Vice President Carl Rygg. The Architectural Committee subsequently approved construction.

March 23, 2017: Mark Virden filed a petition with the Arizona Department of Real Estate, alleging a conflict of interest violation.

June 7, 2017: A hearing was held at the Office of Administrative Hearings.

June 27, 2017: ALJ Tammy L. Eigenheer issued a decision denying the Petitioner’s petition.

July 10, 2017: The Commissioner of the Department of Real Estate issued a Final Order adopting the ALJ’s decision.

Petitioner’s Allegations and Arguments

The petition filed by Mark Virden centered on a violation of A.R.S. § 33-1811, which governs contracts and conflicts of interest for HOA boards of directors.

Primary Allegation: Undisclosed Conflict of Interest

The Petitioner alleged that the HOA violated state law by failing to disclose a conflict of interest related to the tower’s approval.

The Conflict: Susan Talarico, a licensed realtor serving on the Architectural Committee, had a conflict because her husband, Lou Talarico, paid an upfront fee to the tower company. In exchange for this payment, the Talaricos and HOA Vice President Carl Rygg were to receive free internet service for as long as the tower remained operational.

The Alleged Violation: According to the petition, this arrangement constituted compensation that should have been formally declared in an open meeting before any action was taken, as required by law. The petition states: “This law states that if a member of the board is receiving compensation, and has not declared that conflict in advance, then any contract entered into in violation of this law is void and unenforceable!”

Perceived Inadequate Compensation: The Petitioner claimed the value of the free service far exceeded the cash contribution, stating, “…their contribution would only pay the equivalent of about 1-2 years of service for the two households.”

Lack of Transparency: The petition alleges a refusal by the involved board members to provide details of their arrangement. When asked about the compensation, the Vice President reportedly stated, “it’s none of your business.”

Secondary Argument

The Petitioner alternatively argued that the Architectural Committee exceeded its authority. Because the tower could provide service to individuals outside the HOA, it was not exclusively “for the benefit of all or portions” of the HOA, as stipulated by the governing documents.

Personal Grievance

The petition notes a direct personal impact on the Petitioner, stating that the tower was constructed within 150 feet of his front door and that he found it to be “a huge eye sore.”

Respondent’s Governance and Authority

The Lakeside Ski Village HOA’s defense rested on its specific governing documents and organizational structure, which were found to be central to the case’s outcome.

Unconventional Board Structure: The HOA does not have a traditional, separate board of directors. Its Bylaws stipulate that “The affairs of the Association will be managed by the Members, who by the Association’s Articles of Organization are authorized to exercise all powers normally exercised by a board of directors.”

Delegated Authority to Architectural Committee: The HOA’s Declaration of Covenants, Conditions, Restrictions and Easements (CC&Rs) grants specific and independent power to its Architectural Committee. The CC&Rs state: “The Architectural Committee may permit one or more aerial satellite dishes or satellite communication systems, and/or other apparatus and equipment for an antenna or cable system for the benefit of all or portions of the Project.”

This structure meant that the authority to approve the tower resided with the committee, not the general membership acting as a board.

Adjudication and Final Ruling

The dispute was adjudicated by the Office of Administrative Hearings, with the final decision adopted by the Department of Real Estate. The Petitioner’s claims were ultimately rejected.

Administrative Law Judge’s Decision

The ALJ’s decision, issued on June 27, 2017, denied the petition based on the following legal rationale:

Architectural Committee’s Authority Was Dispositive: The ALJ found that the CC&Rs explicitly empowered the Architectural Committee to approve the communication tower. Crucially, the decision established that “Nothing in the CC&Rs requires that the Architectural Committee’s decision must be ratified by the members acting as a board.”

Conflict of Interest Law Not Applicable: A.R.S. § 33-1811 applies to actions and decisions taken “by or on behalf of the board of directors.” Because the Architectural Committee acted under its own authority granted by the CC&Rs, its decision was not an action of the “board” as defined by the statute.

Conclusion on Disclosure: The ALJ concluded that even if the free internet service was considered compensation (assuming arguendo), the arrangement “did not have to be disclosed to the members acting as a board.”

Rejection of Secondary Argument: The ALJ dismissed the argument that the tower did not benefit the HOA, noting that the CC&R language “does not require that the satellite dish or other system may benefit exclusively all or portions of the HOA.”

The final conclusion of the tribunal was that “the Architectural Committee’s approval of the AireBeam tower was proper under Respondent’s governing documents.”

Final Order of the Department of Real Estate

On July 10, 2017, Judy Lowe, Commissioner of the Department of Real Estate, issued a Final Order that formally adopted the ALJ’s decision.

Outcome: The Petitioner’s petition was officially denied.

Binding Nature: The Order is binding on the parties and represents a final administrative action.

Avenues for Appeal: The Order noted that a party may request a rehearing within 30 days for specific causes, such as procedural irregularity, newly discovered evidence, or an arbitrary or capricious decision. Furthermore, a party may appeal the final administrative decision by filing a complaint for judicial review.


Mark Virden vs. Lakeside Ski Village HOA

Case Summary

Case ID 17F-H1717027-REL
Agency ADRE
Tribunal OAH
Decision Date 2017-06-27
Administrative Law Judge Tammy L. Eigenheer
Outcome loss
Filing Fees Refunded $500.00
Civil Penalties $0.00

Parties & Counsel

Petitioner Mark Virden Counsel
Respondent Lakeside Ski Village HOA Counsel Stewart F. Salwin

Alleged Violations

A.R.S. § 33-1811

Outcome Summary

The petition was denied because the Tribunal found that the HOA's Architectural Committee had the authority to approve the internet tower under the governing documents (CC&Rs) without requiring ratification or disclosure of potential conflicts to the members acting as the board, thus avoiding a violation of A.R.S. § 33-1811 in this instance.

Why this result: The decision to approve the tower was made by the Architectural Committee, which had independent authority under the CC&Rs. Therefore, the requirements of A.R.S. § 33-1811 regarding disclosure of compensation to the members acting as the board were found not to apply to the Committee's action.

Key Issues & Findings

Board of Directors, Contracts, and Conflicts

Petitioner alleged that the HOA violated A.R.S. § 33-1811 when it allowed the construction of an internet service tower after a board member's spouse paid the upfront fee in exchange for permanent free service (compensation). Petitioner argued this compensation required disclosure in an open meeting of the board before approval, which did not occur.

Orders: Petitioner's petition is denied.

Filing fee: $500.00, Fee refunded: No

Disposition: respondent_win

Cited:

  • A.R.S. § 33-1811
  • A.R.S. § 32-2199 et seq.
  • A.A.C. R2-19-119
  • A.R.S. § 33-1804

Analytics Highlights

Topics: conflict_of_interest, architectural_committee, board_authority, internet_tower, compensation, CC&Rs
Additional Citations:

  • A.R.S. § 33-1811
  • A.R.S. § 32-2199 et seq.
  • A.A.C. R2-19-119
  • A.R.S. § 33-1804

Audio Overview

Decision Documents

17F-H1717027-REL Decision – 571928.pdf

Uploaded 2025-10-08T06:57:42 (82.2 KB)

17F-H1717027-REL Decision – 575046.pdf

Uploaded 2025-10-08T06:57:42 (736.4 KB)





Briefing Doc – 17F-H1717027-REL


Briefing: Virden v. Lakeside Ski Village HOA (Case No. 17F-H1717027-REL)

Executive Summary

This briefing document outlines the legal dispute between homeowner Mark Virden (Petitioner) and the Lakeside Ski Village Homeowners Association (Respondent) concerning the construction of an internet service tower on HOA common property. The Petitioner alleged a violation of Arizona’s conflict of interest statute (A.R.S. § 33-1811), asserting that HOA officials received undisclosed compensation—lifelong free internet service—in exchange for approving the tower.

The case culminated in a definitive ruling against the Petitioner. An Administrative Law Judge (ALJ) denied the petition, a decision that was subsequently adopted and finalized by the Commissioner of the Arizona Department of Real Estate. The core of the ruling rested on the HOA’s unique governance structure. The decision to approve the tower was made not by the general “board of directors” (in this HOA, the members act as the board), but by the Architectural Committee, which was vested with independent authority to do so by the HOA’s governing documents (CC&Rs). Consequently, the ALJ concluded that the state law requiring conflict of interest disclosures before the board was not applicable to the committee’s action, rendering the Petitioner’s central argument invalid. The approval of the tower was deemed proper under the HOA’s governing rules.

Case Overview

Entity

Name / Description

Case Number

17F-H1717027-REL

Petitioner

Mark Virden

Respondent

Lakeside Ski Village HOA

Presiding ALJ

Tammy L. Eigenheer

Adjudicating Body

Arizona Office of Administrative Hearings

Final Authority

Commissioner, Arizona Department of Real Estate

Timeline of Key Events

Circa 2017: The internet company AireBeam approached the HOA to install a service tower but did not secure enough subscribers to fund the project.

Circa 2017: Lou Talarico, husband of an Architectural Committee member, offered to pay the tower’s upfront cost in exchange for free service for himself and HOA Vice President Carl Rygg. The Architectural Committee subsequently approved construction.

March 23, 2017: Mark Virden filed a petition with the Arizona Department of Real Estate, alleging a conflict of interest violation.

June 7, 2017: A hearing was held at the Office of Administrative Hearings.

June 27, 2017: ALJ Tammy L. Eigenheer issued a decision denying the Petitioner’s petition.

July 10, 2017: The Commissioner of the Department of Real Estate issued a Final Order adopting the ALJ’s decision.

Petitioner’s Allegations and Arguments

The petition filed by Mark Virden centered on a violation of A.R.S. § 33-1811, which governs contracts and conflicts of interest for HOA boards of directors.

Primary Allegation: Undisclosed Conflict of Interest

The Petitioner alleged that the HOA violated state law by failing to disclose a conflict of interest related to the tower’s approval.

The Conflict: Susan Talarico, a licensed realtor serving on the Architectural Committee, had a conflict because her husband, Lou Talarico, paid an upfront fee to the tower company. In exchange for this payment, the Talaricos and HOA Vice President Carl Rygg were to receive free internet service for as long as the tower remained operational.

The Alleged Violation: According to the petition, this arrangement constituted compensation that should have been formally declared in an open meeting before any action was taken, as required by law. The petition states: “This law states that if a member of the board is receiving compensation, and has not declared that conflict in advance, then any contract entered into in violation of this law is void and unenforceable!”

Perceived Inadequate Compensation: The Petitioner claimed the value of the free service far exceeded the cash contribution, stating, “…their contribution would only pay the equivalent of about 1-2 years of service for the two households.”

Lack of Transparency: The petition alleges a refusal by the involved board members to provide details of their arrangement. When asked about the compensation, the Vice President reportedly stated, “it’s none of your business.”

Secondary Argument

The Petitioner alternatively argued that the Architectural Committee exceeded its authority. Because the tower could provide service to individuals outside the HOA, it was not exclusively “for the benefit of all or portions” of the HOA, as stipulated by the governing documents.

Personal Grievance

The petition notes a direct personal impact on the Petitioner, stating that the tower was constructed within 150 feet of his front door and that he found it to be “a huge eye sore.”

Respondent’s Governance and Authority

The Lakeside Ski Village HOA’s defense rested on its specific governing documents and organizational structure, which were found to be central to the case’s outcome.

Unconventional Board Structure: The HOA does not have a traditional, separate board of directors. Its Bylaws stipulate that “The affairs of the Association will be managed by the Members, who by the Association’s Articles of Organization are authorized to exercise all powers normally exercised by a board of directors.”

Delegated Authority to Architectural Committee: The HOA’s Declaration of Covenants, Conditions, Restrictions and Easements (CC&Rs) grants specific and independent power to its Architectural Committee. The CC&Rs state: “The Architectural Committee may permit one or more aerial satellite dishes or satellite communication systems, and/or other apparatus and equipment for an antenna or cable system for the benefit of all or portions of the Project.”

This structure meant that the authority to approve the tower resided with the committee, not the general membership acting as a board.

Adjudication and Final Ruling

The dispute was adjudicated by the Office of Administrative Hearings, with the final decision adopted by the Department of Real Estate. The Petitioner’s claims were ultimately rejected.

Administrative Law Judge’s Decision

The ALJ’s decision, issued on June 27, 2017, denied the petition based on the following legal rationale:

Architectural Committee’s Authority Was Dispositive: The ALJ found that the CC&Rs explicitly empowered the Architectural Committee to approve the communication tower. Crucially, the decision established that “Nothing in the CC&Rs requires that the Architectural Committee’s decision must be ratified by the members acting as a board.”

Conflict of Interest Law Not Applicable: A.R.S. § 33-1811 applies to actions and decisions taken “by or on behalf of the board of directors.” Because the Architectural Committee acted under its own authority granted by the CC&Rs, its decision was not an action of the “board” as defined by the statute.

Conclusion on Disclosure: The ALJ concluded that even if the free internet service was considered compensation (assuming arguendo), the arrangement “did not have to be disclosed to the members acting as a board.”

Rejection of Secondary Argument: The ALJ dismissed the argument that the tower did not benefit the HOA, noting that the CC&R language “does not require that the satellite dish or other system may benefit exclusively all or portions of the HOA.”

The final conclusion of the tribunal was that “the Architectural Committee’s approval of the AireBeam tower was proper under Respondent’s governing documents.”

Final Order of the Department of Real Estate

On July 10, 2017, Judy Lowe, Commissioner of the Department of Real Estate, issued a Final Order that formally adopted the ALJ’s decision.

Outcome: The Petitioner’s petition was officially denied.

Binding Nature: The Order is binding on the parties and represents a final administrative action.

Avenues for Appeal: The Order noted that a party may request a rehearing within 30 days for specific causes, such as procedural irregularity, newly discovered evidence, or an arbitrary or capricious decision. Furthermore, a party may appeal the final administrative decision by filing a complaint for judicial review.


Mark Virden vs. Lakeside Ski Village HOA

Case Summary

Case ID 17F-H1717027-REL
Agency ADRE
Tribunal OAH
Decision Date 2017-06-27
Administrative Law Judge Tammy L. Eigenheer
Outcome loss
Filing Fees Refunded $500.00
Civil Penalties $0.00

Parties & Counsel

Petitioner Mark Virden Counsel
Respondent Lakeside Ski Village HOA Counsel Stewart F. Salwin

Alleged Violations

A.R.S. § 33-1811

Outcome Summary

The petition was denied because the Tribunal found that the HOA's Architectural Committee had the authority to approve the internet tower under the governing documents (CC&Rs) without requiring ratification or disclosure of potential conflicts to the members acting as the board, thus avoiding a violation of A.R.S. § 33-1811 in this instance.

Why this result: The decision to approve the tower was made by the Architectural Committee, which had independent authority under the CC&Rs. Therefore, the requirements of A.R.S. § 33-1811 regarding disclosure of compensation to the members acting as the board were found not to apply to the Committee's action.

Key Issues & Findings

Board of Directors, Contracts, and Conflicts

Petitioner alleged that the HOA violated A.R.S. § 33-1811 when it allowed the construction of an internet service tower after a board member's spouse paid the upfront fee in exchange for permanent free service (compensation). Petitioner argued this compensation required disclosure in an open meeting of the board before approval, which did not occur.

Orders: Petitioner's petition is denied.

Filing fee: $500.00, Fee refunded: No

Disposition: respondent_win

Cited:

  • A.R.S. § 33-1811
  • A.R.S. § 32-2199 et seq.
  • A.A.C. R2-19-119
  • A.R.S. § 33-1804

Analytics Highlights

Topics: conflict_of_interest, architectural_committee, board_authority, internet_tower, compensation, CC&Rs
Additional Citations:

  • A.R.S. § 33-1811
  • A.R.S. § 32-2199 et seq.
  • A.A.C. R2-19-119
  • A.R.S. § 33-1804

Audio Overview

Decision Documents

17F-H1717027-REL Decision – 571928.pdf

Uploaded 2025-10-08T07:01:55 (82.2 KB)

17F-H1717027-REL Decision – 575046.pdf

Uploaded 2025-10-08T07:01:56 (736.4 KB)





Briefing Doc – 17F-H1717027-REL


Briefing: Virden v. Lakeside Ski Village HOA (Case No. 17F-H1717027-REL)

Executive Summary

This briefing document outlines the legal dispute between homeowner Mark Virden (Petitioner) and the Lakeside Ski Village Homeowners Association (Respondent) concerning the construction of an internet service tower on HOA common property. The Petitioner alleged a violation of Arizona’s conflict of interest statute (A.R.S. § 33-1811), asserting that HOA officials received undisclosed compensation—lifelong free internet service—in exchange for approving the tower.

The case culminated in a definitive ruling against the Petitioner. An Administrative Law Judge (ALJ) denied the petition, a decision that was subsequently adopted and finalized by the Commissioner of the Arizona Department of Real Estate. The core of the ruling rested on the HOA’s unique governance structure. The decision to approve the tower was made not by the general “board of directors” (in this HOA, the members act as the board), but by the Architectural Committee, which was vested with independent authority to do so by the HOA’s governing documents (CC&Rs). Consequently, the ALJ concluded that the state law requiring conflict of interest disclosures before the board was not applicable to the committee’s action, rendering the Petitioner’s central argument invalid. The approval of the tower was deemed proper under the HOA’s governing rules.

Case Overview

Entity

Name / Description

Case Number

17F-H1717027-REL

Petitioner

Mark Virden

Respondent

Lakeside Ski Village HOA

Presiding ALJ

Tammy L. Eigenheer

Adjudicating Body

Arizona Office of Administrative Hearings

Final Authority

Commissioner, Arizona Department of Real Estate

Timeline of Key Events

Circa 2017: The internet company AireBeam approached the HOA to install a service tower but did not secure enough subscribers to fund the project.

Circa 2017: Lou Talarico, husband of an Architectural Committee member, offered to pay the tower’s upfront cost in exchange for free service for himself and HOA Vice President Carl Rygg. The Architectural Committee subsequently approved construction.

March 23, 2017: Mark Virden filed a petition with the Arizona Department of Real Estate, alleging a conflict of interest violation.

June 7, 2017: A hearing was held at the Office of Administrative Hearings.

June 27, 2017: ALJ Tammy L. Eigenheer issued a decision denying the Petitioner’s petition.

July 10, 2017: The Commissioner of the Department of Real Estate issued a Final Order adopting the ALJ’s decision.

Petitioner’s Allegations and Arguments

The petition filed by Mark Virden centered on a violation of A.R.S. § 33-1811, which governs contracts and conflicts of interest for HOA boards of directors.

Primary Allegation: Undisclosed Conflict of Interest

The Petitioner alleged that the HOA violated state law by failing to disclose a conflict of interest related to the tower’s approval.

The Conflict: Susan Talarico, a licensed realtor serving on the Architectural Committee, had a conflict because her husband, Lou Talarico, paid an upfront fee to the tower company. In exchange for this payment, the Talaricos and HOA Vice President Carl Rygg were to receive free internet service for as long as the tower remained operational.

The Alleged Violation: According to the petition, this arrangement constituted compensation that should have been formally declared in an open meeting before any action was taken, as required by law. The petition states: “This law states that if a member of the board is receiving compensation, and has not declared that conflict in advance, then any contract entered into in violation of this law is void and unenforceable!”

Perceived Inadequate Compensation: The Petitioner claimed the value of the free service far exceeded the cash contribution, stating, “…their contribution would only pay the equivalent of about 1-2 years of service for the two households.”

Lack of Transparency: The petition alleges a refusal by the involved board members to provide details of their arrangement. When asked about the compensation, the Vice President reportedly stated, “it’s none of your business.”

Secondary Argument

The Petitioner alternatively argued that the Architectural Committee exceeded its authority. Because the tower could provide service to individuals outside the HOA, it was not exclusively “for the benefit of all or portions” of the HOA, as stipulated by the governing documents.

Personal Grievance

The petition notes a direct personal impact on the Petitioner, stating that the tower was constructed within 150 feet of his front door and that he found it to be “a huge eye sore.”

Respondent’s Governance and Authority

The Lakeside Ski Village HOA’s defense rested on its specific governing documents and organizational structure, which were found to be central to the case’s outcome.

Unconventional Board Structure: The HOA does not have a traditional, separate board of directors. Its Bylaws stipulate that “The affairs of the Association will be managed by the Members, who by the Association’s Articles of Organization are authorized to exercise all powers normally exercised by a board of directors.”

Delegated Authority to Architectural Committee: The HOA’s Declaration of Covenants, Conditions, Restrictions and Easements (CC&Rs) grants specific and independent power to its Architectural Committee. The CC&Rs state: “The Architectural Committee may permit one or more aerial satellite dishes or satellite communication systems, and/or other apparatus and equipment for an antenna or cable system for the benefit of all or portions of the Project.”

This structure meant that the authority to approve the tower resided with the committee, not the general membership acting as a board.

Adjudication and Final Ruling

The dispute was adjudicated by the Office of Administrative Hearings, with the final decision adopted by the Department of Real Estate. The Petitioner’s claims were ultimately rejected.

Administrative Law Judge’s Decision

The ALJ’s decision, issued on June 27, 2017, denied the petition based on the following legal rationale:

Architectural Committee’s Authority Was Dispositive: The ALJ found that the CC&Rs explicitly empowered the Architectural Committee to approve the communication tower. Crucially, the decision established that “Nothing in the CC&Rs requires that the Architectural Committee’s decision must be ratified by the members acting as a board.”

Conflict of Interest Law Not Applicable: A.R.S. § 33-1811 applies to actions and decisions taken “by or on behalf of the board of directors.” Because the Architectural Committee acted under its own authority granted by the CC&Rs, its decision was not an action of the “board” as defined by the statute.

Conclusion on Disclosure: The ALJ concluded that even if the free internet service was considered compensation (assuming arguendo), the arrangement “did not have to be disclosed to the members acting as a board.”

Rejection of Secondary Argument: The ALJ dismissed the argument that the tower did not benefit the HOA, noting that the CC&R language “does not require that the satellite dish or other system may benefit exclusively all or portions of the HOA.”

The final conclusion of the tribunal was that “the Architectural Committee’s approval of the AireBeam tower was proper under Respondent’s governing documents.”

Final Order of the Department of Real Estate

On July 10, 2017, Judy Lowe, Commissioner of the Department of Real Estate, issued a Final Order that formally adopted the ALJ’s decision.

Outcome: The Petitioner’s petition was officially denied.

Binding Nature: The Order is binding on the parties and represents a final administrative action.

Avenues for Appeal: The Order noted that a party may request a rehearing within 30 days for specific causes, such as procedural irregularity, newly discovered evidence, or an arbitrary or capricious decision. Furthermore, a party may appeal the final administrative decision by filing a complaint for judicial review.